Last updated November 17, 2026
New windows and doors improve comfort, cut energy bills and add long-term value to your home. Westlight Windows & Doors Henderson pairs proven product lines with a local vetted installing partner for lasting performance - and a price put in writing.
Choose your installer
The unit is half the job - the install is the other half. Background-checked local installers measure, set, seal and insulate every opening, and they know the lines we quote inside and out.
Select the right products
Compare styles, materials and glass packages side by side until the fit is right for your rooms, your budget and your goals. The product-line comparison below is the place to start.
Prepare your home for install
Before install day we walk you through a short checklist - furniture pulled back, treatments down, a clear path to each opening - so install day is watch-it-happen, not scramble.
Compare the Lines We Quote
Every project is priced on the same lines, side by side - the price indicators below are relative, and your consultant shows exact numbers on your actual openings.
PGTThe line homeowners arrive naming - the most impact certifications in the industry$$$
- More impact certifications than any other line we quote
- WinGuard, EnergyVue and ClassicVue Max systems built for every wind zone
- 99% on-time delivery keeps your install date on the calendar
CGIThe heavyweight impact line$$$$$
- Large-missile impact ratings for the strictest wind zones
- Architectural-grade aluminum with commercial-depth frames
- The line we quote when protection is the whole point
CWSThe value pick$$
- Vinyl systems built to strict wind codes
- Strong energy packages at the friendliest price point
- The smart start for whole-home replacements on a budget
ESWSlim lines, big glass$$$$
- Narrow-sightline aluminum for modern elevations
- Oversized openings and floor-to-ceiling glass
- Impact-rated without the bunker look
ECOThe aluminum impact workhorse$$$
- Factory-built aluminum impact systems
- A strong price-to-protection ratio for coastal homes
- Proven lines with short lead times
How Long Does Door Installation Take? Timelines and What to Expect
If a crew tells you they’ll swap your entry door in 45 minutes, ask what they’re skipping. Proper shimming, squaring, and weatherstrip seating alone take close to that on a straightforward job. Most online timelines assume a perfect opening, a perfectly level slab, and a house that hasn’t moved since 1995. Real Henderson homes rarely cooperate. A pre-hung entry door typically lands at 2 to 3 hours, a sliding patio door at 3 to 5, and French doors at 4 to 6, but those ranges stretch the moment stucco, settled concrete, or summer heat enter the picture. This guide breaks down honest per-scenario times, what a good crew is actually doing during each phase, and the shortcuts that make a job look fast before it fails.
Quick Answer
Door installation usually takes 2 to 6 hours per door, depending on type: 2 to 3 hours for a pre-hung entry door, 3 to 5 hours for a sliding patio door, and 4 to 6 hours for French or double doors. In Henderson, add 30 to 90 minutes for stucco patching, threshold leveling on settled slabs, and hardware alignment in heat-expanded frames. A written arrival and completion window from a licensed installer is the only timeline worth planning around.
Table of Contents
- Timelines by Door Type: Pre-Hung, Sliding, and French
- Why Door Installation Timelines Vary So Much
- Henderson-Specific Time Adders
- What a Professional Crew Is Doing During Each Phase
- The Shortcuts That Make a Job Look Fast
- What the Kingswell Guarantee Means for Your Timeline
- Planning Your Day Around the Install
Timelines by Door Type: Pre-Hung, Sliding, and French
Door type is the single biggest driver of how long a job runs. A pre-hung door arrives already set in its frame, so the crew is fitting a complete unit into the rough opening rather than building the frame on site. That’s why it moves fastest. Here’s what our crews see across Henderson installs, using products from lines like Therma-Tru for entry doors:
- Pre-hung entry door: 2 to 3 hours. Remove the old unit, inspect the framing, shim and square the new door, set the hinges, align the lockset and deadbolt, seat the weatherstrip, and caulk the exterior. On a home in Green Valley where the framing is straight and the threshold is level, 2 hours is realistic. Add an hour if the old frame was rotten or welded in with construction adhesive.
- Sliding patio door: 3 to 5 hours. These are heavier, the opening is wider, and the track has to sit dead level or the panel drags. Removing a glass slider safely takes two people. Setting the new frame, leveling the track, hanging the panel, and adjusting the rollers for smooth travel all take time. This is one of the more physically demanding jobs on the schedule.
- French doors (double or hinged): 4 to 6 hours. Two leaves, one opening, and both have to meet in the middle with an even reveal and matching swing. The frames are wider and heavier, and squaring one leaf affects the other. A double exterior French door unit into a Henderson home can easily run to 6 hours once trim and threshold work are counted.
None of these ranges include a second door. A three-door order (front entry, patio slider, and a garage service door) is a full-day project, so plan for it as one. If you’re weighing a door refresh against new windows at the same time, our Westlight Windows & Doors Henderson home page lays out how we coordinate a multi-opening job so the crew isn’t running back and forth.
Why Door Installation Timelines Vary So Much
Two doors of the same size in two different houses can take wildly different amounts of time. The door isn’t usually the variable; the opening is. Here’s what actually moves the clock:
- Age and condition of the rough opening. A 20-year-old home in Anthem has framing that’s dried and settled. Pulling the old door may reveal rot, cracked jack studs, or a header that’s out of square. Any of those add time for repair before the new unit goes in.
- Whether the old door comes out cleanly. A door installed with screws through the face and sealed with polyurethane can take an extra 30 to 45 minutes just to free. Saved time on removal is time added later.
- Interior and exterior finish work. Casing, trim, threshold caps, and caulk lines all count. A finished install includes clean trim on both sides, not just a door screwed into a hole.
- Hardware and lockset alignment. Getting the deadbolt, handle, and strike plate to line up so the door latches with a fingertip is fussy work. It’s the difference between a door you have to shoulder shut and one that clicks.
- Weather and heat. Las Vegas Valley summers push exterior door frames to expand, which means hardware that aligned at 7 a.m. may not align at 2 p.m. A good crew works around this; a fast crew ignores it.
This is why we don’t quote a time on the phone and call it done. The written window we give each Henderson homeowner is based on the specific door, the specific opening, and what our technician finds when the old unit comes out.
Henderson-Specific Time Adders
Some of the places where door installation eats time are specific to how homes are built in Henderson, and the climate makes a few of them worse. Here’s what our crews account for:
- Stucco patching around the frame. Henderson homes are overwhelmingly stucco exterior, and pulling an entry door means cutting back the stucco at the frame edge. That has to be patched and feathered so the new casing sits flush. Budget 30 to 60 minutes for stucco and paint touch-up on a standard entry, and note that the patch needs to cure before it’s painted, so a same-visit finish depends on timing.
- Threshold leveling on settled slabs. Henderson sits on soil that includes caliche and expansive clay in places, and slabs settle. A patio slider that tracked fine 15 years ago may now sit on a concrete threshold that’s off by a quarter inch. Leveling the threshold and adjusting the track adds 20 to 40 minutes for a slider, longer if the slab needs a shim bed.
- Hardware alignment in heat-expanded frames. In July and August, exterior frames move noticeably through the day. Setting a deadbolt when the frame is at peak expansion can leave it misaligned by evening. Our techs set hardware and check it twice, once cool and once warm, which adds a few minutes but prevents a callback.
- Wind and dust during caulk and seal work. Spring winds in the valley push dust into fresh caulk lines. A crew that cares will mask and clean, and that’s part of the time estimate.
None of these are surprises to a local crew. They’re the reason our Henderson timelines run 30 to 90 minutes longer than a generic national estimate, and why we’d rather tell you upfront than leave you wondering why the door is still leaning against the wall at hour three.
What a Professional Crew Is Doing During Each Phase
Understanding the phases helps you tell a real install from a rushed one. Here’s the sequence a good crew follows on a pre-hung entry door, which is the most common job:
- Protect the space (5 to 10 minutes). Drop cloths, masking tape, and moving furniture clear of the swing. The Kingswell Way includes leaving the place cleaner than we found it, and that starts before the door comes out.
- Remove the old unit (15 to 30 minutes). Score the caulk, pull the trim, cut the fasteners, and lift the door out. Inspect the rough opening for rot, square, and header condition.
- Set and shim the new frame (30 to 45 minutes). The door goes into the opening, shims are tapped into the gap at the hinge points and threshold, and the frame is checked with a level and square. The gap around the unit should be even on all four sides. This is the phase that gets rushed and shouldn’t be.
- Square, check the swing (10 to 15 minutes). The door is opened and closed through its full arc. If it rubs at the top, the frame is out of square and the shims need adjusting. A properly squared door sits in its jamb without effort.
- Set hardware (20 to 30 minutes). Hinges, handle, deadbolt, and strike plate are installed and aligned. The strike plate gets its full complement of screws, not two out of four.
- Weatherstrip, seal, caulk (20 to 30 minutes). Weatherstrip is seated so there are no gaps in the seal, exterior caulk is run, and interior casing is fitted. Paint touch-up on the stucco happens here or on a return visit.
- Final check and cleanup (10 to 15 minutes). The door is tested, the site is swept, and the written guarantee is handed over.
Add it up and a straightforward pre-hung entry runs about 2 to 3 hours. That’s not a padded estimate; it’s what the work actually involves.
The Shortcuts That Make a Job Look Fast
A door install can go fast and be wrong. In our experience the shortest jobs are often the ones that come back. Here are the three shortcuts our technicians see most, and what each one costs a homeowner down the road:
- Skipped shimming. A door that’s screwed in without proper shims will sit tight and swing fine the day of install. Within a year, the frame racks and the door drags at the top corner. The fix is a full re-set, not an adjustment.
- Caulk-over-gap sealing. Instead of addressing a gap between the frame and the rough opening, some installers fill it with expanding foam or caulk and paint over it. Henderson heat and the annual monsoon push water against the exterior, and caulk that’s bridging a structural gap will fail. Water finds the gap, then the framing behind it.
- Unset screws in the strike plate. The strike plate is the most-loaded piece of hardware on the door, and it takes four screws for a reason. Leave two of them out and the door eventually kicks the plate loose. That shows up as a door that won’t latch and a deadbolt that hits the frame.
These shortcuts are exactly why we put the guarantee in writing. A job that looks finished at hour two but fails at month six has a place in our records. Our entry door work uses Therma-Tru and ES Windows products, both of which specify certain installation methods, and those specs don’t support shortcuts.
What the Kingswell Guarantee Means for Your Timeline
Most timelines you get from a contractor are approximations given over the phone. The Kingswell Guarantee changes that: the arrival window and the completion expectation are written into the contract before any work starts. If the crew’s window was 8 to 10 a.m. and they’re not there by 10, that’s on us, not on you.
The guarantee covers four things on every job. The written price arrives before work starts, and it doesn’t get revised at the door. The arrival window is a real window, not an approximate morning. A clean job site is the standard, not a bonus. And a written guarantee on the work itself comes with the project, backed by the 365-Day Done Right Promise. If the work isn’t right within that period, we come back and fix it at no charge. If a repair fails, the free second visit is automatic, no negotiating.
What this means for timelines specifically is that you can plan around the person on your calendar. If you’re booking a day off work to sit with the crew, you don’t need to book the whole day, and you know which half. For a fuller look at how we approach scheduling and product selection, our Door Installation in Henderson service page walks through the process from estimate to finish.
Planning Your Day Around the Install
You don’t have to lose a workday to a door install, but you should plan the day around it. Here’s how our Henderson customers usually handle it:
- Book the estimate first, not the install. The written quote tells you the door type, the price, and the window. The install date gets set once the product is confirmed and on hand.
- Clear the swing area and the path. Moving furniture out of the way saves the crew 10 minutes and you a scuffed floor.
- Plan for a half-day of access. A pre-hung entry needs the front door blocked open during install, which means you can’t leave the house during that time. Ask for the arrival window and plan the morning or afternoon around it.
- Expect stucco touch-up as a separate small step. If the patch needs to cure, plan a follow-up for paint. Our crews will tell you at the end of the job when that comes back, not leave it to you to chase.
- Double-check before the crew leaves. Open and close the door through the full swing, throw the deadbolt, feel for drafts along the weatherstrip, and check the trim lines. Anything off goes on the written punch list, and it gets handled before we call the job closed.
If you’re also considering new windows on the same visit, our Window Installation in Henderson page explains how we sequence multiple openings so the crew isn’t bouncing between tasks. For window work specifically, Window Replacement in Henderson covers what changes when you’re replacing rather than installing new.
Common Mistakes to Avoid
- Believing a phone quote that has no written timeframe. If the arrival and completion window isn’t on paper, it isn’t a commitment. Get it in the contract.
- Scheduling the install without clearing the swing. A crew that has to move furniture and boxes loses time on the clock you’re paying for, and scuffed floors are avoidable.
- Letting a crew caulk and leave without testing the deadbolt. In Henderson heat, a deadbolt that lined up at 9 a.m. can be stiff by 3 p.m. Test it before the truck leaves.
- Assuming a short install is a good install. Two hours for a pre-hung entry is normal. Ninety minutes usually means shimming or hardware alignment got skipped.
- Skipping the weatherstrip check on a Henderson summer install. A door that seals in spring may leak cool air by August once the frame expands. Confirm the seal holds when the door is warm.
- Paying for stucco repair separately when it should be in the install. Patching around the frame is part of the job, not an add-on line item.
- Not asking which door line the quote covers. The product matters. Our quotes name the manufacturer, so a Therma-Tru entry and a builder-grade import aren’t compared as though they’re the same job.
When to Call a Professional
If you’re replacing an exterior entry door, a patio slider, or a set of French doors, it’s a professional job. These openings are load-bearing for the home’s envelope, and a bad install costs far more to correct than to do right the first time. The same applies if you’re seeing drafts, water staining at a threshold, a door that sticks in summer and drags in winter, or hardware that won’t line up no matter how many times you tighten it. Those are signs of a frame that’s moved, and adjustment isn’t the fix. Our technicians, who have up to 17 years of experience, know the difference between a hinge that needs a shim and a frame that needs a re-set. Westlight Windows & Doors Henderson offers free estimates in Henderson; call (844) 797-3435 to schedule yours.
Frequently Asked Questions
A pre-hung front door typically takes 2 to 3 hours, including removal, shimming, hardware, and caulk. In Henderson, add 30 to 60 minutes if stucco patching around the frame is needed. Call (844) 797-3435 for a written estimate with an arrival window.
Yes, most single door installs finish in one day, and a three-door order (entry, patio slider, and service door) usually runs a full day. Your written window is set at the estimate, so you’ll know which day and which half before the crew shows up. Call (844) 797-3435 to schedule a free estimate.
Because online estimates assume a perfect opening. Henderson’s stucco exteriors, settled slabs, and heat-expanded frames all add time a national calculator can’t account for. A crew working around those realities is doing the job right; one skipping them is doing it fast.
French doors take roughly twice as long, 4 to 6 hours versus 2 to 3 for a pre-hung entry. The extra time is for aligning two leaves to meet evenly in the middle and squaring both frames at the same opening. Call (844) 797-3435 if you’re considering a double-door install and want a realistic window.
Both. The arrival window and the written price are in the contract before work starts, and the completed work is covered by the written guarantee attached to the job, including the 365-Day Done Right Promise. If it isn’t right within the period, we come back and fix it at no charge.
It depends on the door type and product line, and we give you the exact figure in writing before any work starts, with no revision at the door. Our quotes name the manufacturer, so you’re comparing apples to apples. Call (844) 797-3435 for a free estimate.
The Bottom Line
Door installation takes 2 to 6 hours per door depending on type: 2 to 3 for a pre-hung entry, 3 to 5 for a patio slider, 4 to 6 for French doors. In Henderson, add 30 to 90 minutes for stucco, slab settling, and heat-driven frame movement. A written arrival and completion window is worth more than a fast phone estimate, and a job done fast by skipping shims or caulk will cost you a second install within a year. Plan for the half-day, test the hardware before the truck leaves, and get the timeframe on paper.
Westlight Windows & Doors is an independently owned and operated Kingswell location, carrying eight manufacturer lines including Therma-Tru, ES Windows, and ECO Window Systems, with live phone coverage 24 hours a day. If you’re ready for a written price and a real arrival window, call (844) 797-3435 for a free estimate.
Written by the team at Westlight Windows & Doors Henderson.
Six Reasons Homeowners Choose Westlight Windows & Doors Henderson
Laminated glass and reinforced frames hold up to wind-driven rain, hail and flying debris, so your openings stay sealed when the weather turns.
Low-E insulated impact glass from our manufacturer lines commonly cuts monthly cooling bills 20-30%.
Laminated impact glass shuts out up to 40% of outside noise - traffic, neighbors, weather.
Monitoring services run $30-90 a month. Laminated impact glass resists forced entry around the clock, with no subscription.
Tighter seals and insulated glass even out hot and cold rooms and stop the drafts at the frame.
A full impact package upgrades curb appeal, buyer confidence and appraised value in one project.